Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
EIMein®X-0 or M3-X cut back asphalt, meeting the requirements as stated,in Section 3U, may be used as directed by the Engineer and shall be applied at the temperatures VfH,: . . im ndi* c?. ate* d^ b••e ls ows gllgg •** | i Min# F. MC-0 £0° MC-=1 80° (g) The asphalt primer should preferably be entirely absorbed by the baSev course and, therefore, require" no sand cover# If, however, it has not been completely absorbed twenty~fqur (Sli) hours after application, just sufficient sand shall be spread over the surface to blot up the excess liquid asphalt and prevent it fronv picking up under' t r a f f i c A l s o , , sand shall fbe used in amounts deemed nepessary by the Engineer at intersections and such areas where traffic may .pass over the prime Coat, Prior to laying" an intermediate or surface course, all loose or excess sand shall be Stfept from the base# (h) The contractor shall protect the prime coat against all damage and markings both from foot and other traffic. v Barricades'shall be placed at the proper locations to protect the liquid asphalt from traffic. If after the prime coat-has been applied to the satisfaction of the Engineer andhas been accepted by him, it is disturbed by negligence on the partof the contractor, It shall be restored at his expense to its condition at the time of acceptance# No material shall be placed until the prime coat is in a condition satisfactory to the Engineer (I) The amount of completed and accepted work shall be included in,the contract unit price per square yard fob asphaltic concrete pavement, which shall include full Compensation forrfurbishing all labor, materials, tools, equipment, compaction, shaping and water necessary to complete the job. Max. F 120° • 1$ 0°