Skip to main content

Search the Special Collections and Archives Portal

man000125 15

Image

File
Download man000125-015.tif (image/tiff; 105.22 MB)

Information

Digital ID

man000125-015
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    November lli, 1958 File: 100-ii3 Trust Department First National Bank 3rd Street Branch Las Vegas, Nevada Attention: Mr. C. M« Boardman Subject: Proposed Assessment District 100-U3 (Area 1) Gentlemen: With reference to your inquiry of November 10, 1958, concerning methods of installation of the proposed street lighting. In general, the lighting units will be spaced at 90 ft. staggered in­tervals. That would locate the foundations at 180 ft. spacing on each side of the street. The standards will be 30 ft. in height, and will be centered at 18" behind the back of curb. Foundation elevation will be same as existing curb elevations, and flush with any future sidewalk development. Wiring will be overhead. The cost of the improvements will be on a front foot basis far the entire district regardless of present degree of development of the property. The estimated cost of improvements is between $U.OO and #5*00 per front ft. The complete system will be located within the existing street right-of-way and consequently should cause no difficulty in future "on site" develop­ment . We appreciate your interest, and will be happy to supply any further in­formation should you require it. RPS:HR:cd cc. C. A. Stay C. E. Stay F. S. Stay yours, R. P. Sauer Director of Public Works