Radio KENO was airing a public forum on the subject ''will the growth of Las Vegas be limited by shortage of water?'' and wanted a water company representative to participate.
Text
Blueprint maps with introductory letter showing improvements built before December 31, 1950
Text
Report on how to increase the capacity of the Basic Magnesium, Inc. water facilities to allow for more water to go to the Las Vegas Valley Water District
Text
Letter discussing the leasing of water and how all involved parties were optimistic about the deal.
Text
Letter stating that damage to the pipeline was causing damage at the rail yard, and repair work should be undertaken immediately instead of waiting for scheduled maintenance.
Text
Details of pipeline maintenance including sketches of the work to be done in Las Vegas
Text
A test of the new pipeline showed that the line was beyond repair and needed replaced as soon as possible.
Text
Discussion about the repair of the pipeline and how the conditions that it operated under were responsible for its failure.
Text
Request that if the water supply going to the ice plant was to be turned off for any reason, that the ice plant be given 15 to 20 minutes warning to avoid a possible explosion.
Text
An inspection of the pipeline showed that in many places, the asphalt was coming off the pipe and there were quite a few leaks. Maintenance would allow it to last perhaps a year longer, but then it would need to be replaced.
Text