Letter discussing the leasing of water and how all involved parties were optimistic about the deal.
Text
Letter stating that damage to the pipeline was causing damage at the rail yard, and repair work should be undertaken immediately instead of waiting for scheduled maintenance.
Text
Details of pipeline maintenance including sketches of the work to be done in Las Vegas
Text
A test of the new pipeline showed that the line was beyond repair and needed replaced as soon as possible.
Text
Discussion about the repair of the pipeline and how the conditions that it operated under were responsible for its failure.
Text