Suggested schedule for deposits for installation of water meters and connection to the railroad pipeline for industrial concerns. Date stamp from W.H.J. Letter has penciled in column titled "City Charge" next to the "Service Charge" column.
Letter from Bennett calling attention to Nevada Senate Bill No. 155. Senate Bill 155 gives the Las Vegas Valley Water District power in levying taxes and issuing bonds in ways contrary to its original act. According to Bennett, it would create an unfair tax burden on the Los Angeles & Salt Lake Railroad Company and should be defeated. Senate Bill 155 is referenced below.
Letter regarding two plans for providing water service to industrial properties along Main Street in Las Vegas. The letter mentions installation of a pipeline along the southern border of the railroad property and the installation of a lateral line by the Las Vegas Land and Water Company within the city limits . Letter was accompanied by two maps referenced below,
E.G. Tilton, Chief Engineer of the The San Pedro, Los Angeles & Salt Lake Railroad Company, replies that the railroad company has no intention of drilling any wells in Las Vegas because of the abundance of spring water in the area.
Bracken briefing Jeffers on the production problems with Well No. 2, a possible rate increase due to evaporative water coolers, and the water shortage in Las Vegas
On a report that the railroad was not fulfilling its duty to supply water to the Stewart burial plot, Bracken and others visited the site and reported on their findings. An excerpt from the original Stewart deed is referenced below.
Transcribed Notes: Handwritten note at bottom of letter: "Mrs. Mina Stewart Los Angeles 7/25 talked to M & J. No water on burial plot although reservoir overflowed. 7/25."
Letter describing how the pipeline from the Springs should be replaced, and how something needed to be done about the low water pressure experienced by the town when filling trains.