Skip to main content

Search the Special Collections and Archives Portal

upr000060 57

Image

File
Download upr000060-057.tif (image/tiff; 26.32 MB)

Information

Digital ID

upr000060-057
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V ESTIMATE© COST QP CONSTRUCTING 1* WATER SERVICE CONNECTIONS 5* Service Line - 1 L* Material Labor (Good) $11.18 1M 019.00 / / 53 5* Service Line Material Labor (Rad) Compressor 11*18 15*84- 37*02 n '3J> n,^ / Q 20* Service Lin© - 1“ Material Labor (Good) 17.78 islw 33*62 20* Service Line - 1* Material Labor (Good) Compressor 17*7f 31*68 ...m,m 69*46 t S VO ?5'c * 1*01 Service Line - 1* Material Labor (Good) 26*38 31.68 58*26 v7©| Is 4©« Service Line - Material Labor (Bad) Compressor 26*58 Mf.52 114.1© 1 *0 JTv; /1 % Material for 5* Connection 1» Corp. Cock 02*69 1* Cnrb Stop . ^ 3*39 1* Pipe 5 Ft. © 0*44 4^ 2.20 X* Coupling 1.07 1» 90° Bend 1-83 011*18 y 7 o 3 3 ?? o ^