Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 96531 - 96540 of 830907

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-04

Description

Pg.86 #3365 Looking upstream toward Boulder Dam and Power House. Jul. 25, 1935. Pg.86 #3373 Looking across the top of Boulder Dam, from the Nevada side. Jul. 26, 1935. Pg.86 #3378 The Nevada Valve House, with the refrigeration Plant below. July 26, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-04

Description

Pg.87 #3403 Looking upstream toward Boulder Dam and the Power House, from lower portals road. Aug. 26, 1935. Pg.87 #3392 View taken from top of Boulder Dam, looking down on Power House, Valve House, and lower portals. Aug. 26, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-04

Description

Pg.88 #3401 Boulder Dam and Intake Towers, from Arizona side. Aug. 26, 1935. Pg.88 #3408 Looking upstream toward Nevada Spillway drainage flume and general area. Aug. 26, 1935. Pg.88 #3391 Looking upstream toward Boulder Lake, from Observation Point. Aug. 21, 1935. Pg.88 #3409 View taken from Arizona Intake Towers, looking toward Arizona Spillway. Note excavation for the float well supply line. Aug. 26, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-04

Description

Pg.89 #3423 Interior view of Nevada Valve House, looking downstream. Note N-6 Emergency Gate being installed. Aug. 27, 1935. Pg.89 #3424 Nevada Valve House roof, looking upstream. Note low strength pedestals and double layer of railroad iron being placed. Aug. 27, 1935. Pg.89 #3407 Switchyard control house, yard and present sub-station. View taken looking toward Boulder Dam. Aug. 26, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-04

Description

Pg.90 #3417 View of Arizona side of lower portals clean-up. Aug. 26, 1935. Pg.90 #3397 Nevada construction adits, Valve House and plug adit portal. Note absence of upstream end of lower portal road tunnel. Aug. 21, 1935. Pg.90 #3412 View of Nevada side of lower portals clean-up. Aug. 26, 1935. Pg.90 #3431 View taken from downstream Nevada Plug adit, looking toward No.2 downstream plug. Aug. 27, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-17

Description

Pg.91 #3457 Looking upstream toward Boulder Dam and Power House. Sept. 26, 1935 Pg.91 #3460 From top of Boulder Dam, looking down on Power House. Roof slab is practically completed, and canyon wall gutters are in place. Sept. 26, 1935

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-17

Description

Pg.92 #3450 President Roosevelt dedicating Boulder Dam. Sept. 30, 1935. Pg.92 #3479 View taken from adit, showing No.1 pour in downstream No.2 diversion tunnel plug. Cribbing for use as temporary pipe supports. Sept. 27, 1935. Pg.92 #3475 Nevada Intake Tower roofs. Note concrete shingle arrangement. Sept. 27, 1935. Pg.92 #3472 View of Switchyard, showing control house, foundations and general excavation. Sept. 27, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-11-17

Description

Brown Album Back Cover

Construction of Las Vegas Convention Center, image 001: photographic print

Date

1958

Description

Wide view showing construction of the Las Vegas Convention Center.

Image

Construction of Las Vegas Convention Center, image 002: photographic print

Date

1958

Description

View showing construction of the Las Vegas Convention Center

Image