Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 127531 - 127540 of 830972

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1972-08-07

Description

Pg.38 #2720 Form work in Units 8 and 9, Arizona Power House. June 14th, 1934. Pg.38 #2733 Nevada Power House layout. June 21st, 1934. Pg.38 #2730 Night photograph of Power House construction. June 19th, 1934. Pg.38 #2732 Arizona Power House layout. June 21st, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1972-08-23

Description

Pg.17 #2509 Close-up of Boulder Dam. View taken from the Arizona side, looking upstream. Jan. 24th, 1932. Pg.17 #2514 Close-up of slot at the Upstream Face of Boulder Dam. Jan. 24th, 1934 Pg.17 #2512 Downstream face of Boulder Dam, showing foundation for Central Wing of the Power House. Jan. 24th, 1934. Pg.17 #2510 Upstream face of Boulder Dam. Jan. 24th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-01-03

Description

Pg.18 #2528 Forms for transition at the Downstream Plug of Diversion Tunnel No. 2. Jan. 27th, 1934. Pg.18 #2507 Nevada Spillway Weir section. Jan. 24th, 1934. Pg.18 #2506 Nevada Spillway, looking upstream. Jan. 24th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-02-06

Description

Pg.97 #3512 Looking upstream in Arizona Valve House. Note three gates and needle valves have been installed. Oct. 29, 1935. Pg.97 #3497 View from top of Boulder Dam, looking toward Power House, Valve Houses and lower portals of Diversion Tunnels. Oct. 28, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-07-10

Description

Pg.98 #3487 Boulder Dam and Powerhouse, looking upstream from lower cofferdam. Oct. 28, 1935. Pg.98 #3500 Boulder Dam Switchyard, showing excavation and construction. Note Boulder Dam Highway in background. Oct. 28, 1935. Pg.98 #3501 Looking upstream in No.2 downstream plug, showing water conduit being placed. Oct. 28, 1935. Pg.98 #3506 Looking upstream toward No.3 downstream plug. Note clean-up operations, getting ready for carpenters. Oct. 28, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-08-23

Description

Pg.95 #3553 View from the crest of Boulder Dam, looking downstream toward the Power House and lower portals of Diversion tunnels. Nov. 26, 1935. Pg.95 #3527 Boulder Dam and Power House, looking upstream from Nevada side. Note reservoir and Fortification Hill in background. Nov. 23, 1935. Pg.95 #3545 View from reservoir, looking downstream at Boulder Dam and Intake Towers. Nov. 26, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-11-02

Description

Pg.96 #3549 Looking south toward Boulder Dam Switchyard, showing construction and excavation. Nov. 26, 1935. Pg.96 #3531 Looking upstream in lower No.3 Plug. Note one of pipe sections in place. Nov. 25, 1935. Pg.96 #3551 Looking upstream along Nevada approach to Boulder Dam. Note rubble wall being built and excavation for tower footings. Nov. 26, 1935. Pg.96 #3534 Looking upstream in lower No.2 plug, showing pipe in place. Nov 25, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1974-03-08

Description

Pg.3 #2301 Hoist house and Nevada Anchorage, Government Cableway. Aug. 9th, 1933 Pg.3 #2310 Trains on Elev. 720 Railroad Bench, hauling concrete to Hoover Dam. August 12th, 1933. Pg.3 #2322 Hoover Dam. August 15th, 1933.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1974-05-23

Description

Pg.4 #2286 Hoover Dam. July 26th, 1933. Pg.4 #2277 Looking upstream at the Arizona Spillway. July 22nd, 1933. Pg.4 #2278 Looking upstream at the Nevada Spillway. July 22nd, 1933.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1974-09-26

Description

Pg.15 #2478 Arizona Intake Towers. Dec. 27th, 1933. Pg.15 #2479 Arizona Intake Towers Derrick. Dec. 27th, 1933. Pg.15 #2476 Nevada Intake Towers Derrick. Dec. 27th, 1933.