Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-08-03

Description

p.13 #1219 Interior of Diversion Tunnel No.3, near upper portal. Invert and side wall sections of three-feet thick concrete lining have been poured. Jun. 2, 1932 p.13 #1289 Interior of Diversion Tunnel No.3, showing method of pouring alternate slabs in side wall section of tunnel lining. Lining form is shown in background. Jun. 22, 1932. p.13 #1220 Interior of Diversion Tunnel No.2, near upper portal. Invert and side wall sections of lining have been completed. Two cubic yard buckets for pouring concrete are shown on truck. Jun. 2, 1932. p.13 #1273 Detail pic, showing method of construction and operation of side-wall jumbo for placing lining in diversion tunnels. Jun. 29, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-08-03

Description

p.17 #1142 Marion type of 125 electric dragline with 5 cu. yd. bucket loading into 30 cu. yd. side dump cars at gravel pit. Mikado type locomotives pull 10-car trains, 3 trains of this type in operation. May 3, 1932. p.17 #1198 As protection against high water, a "bridle" has been attached to upstream face of gravel pit bridge. A 3-in. cable is anchored to concrete dead-men and horizontal stays are attached to bents on bridge. May 15, 1932. p.17 #1144 Ten car train of gravel crossing 1100 ft. trestle bridge and bound for screening plant. Round trip take slightly over two hours. May 3, 1932 p.17 #1193 Locomotive equipment of Six Companies Inc. on yard at gravel plant. May 15, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-08-17

Description

p.20 #1411 - p.20 #1412 These pictures together with two on opposite page, form panorama of operations being carried on at canyon rim, on Nevada side. Photo was taken from Arizona Spillway site. To the left is shown Black Canyon Highway. High level mixing plant will be located behind fill on the road. To the right is shown highway extension road to Nevada Spillway. Note shovel boom projecting at former site of Lookout Point. Aug. 12, 1932. p.20 #1451 Three hundred boxes of dynamite were used in spectacular blast which demolished Lookout Point. Picture taken from new Look Point, on Black Canyon Highway. Aug. 16, 1932. p.20 #1452 Blasting usually scheduled for 11:30 a.m., and billowing dust dislodged from canyon rim completely fills the canyon. Aug. 16, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1975-05-19

Description

Pg.28 #2653 View of Boulder Dam and the Nevada Intake Towers, taken from the Arizona side. "Monkey Slide" down Nevada abutment of Dam shown in center. April 28th, 1934. Pg.29 #2630 Looking upstream in Black Canyon, from the Nevada side, showing Boulder Dam and the Arizona Intake Towers in center. Arizona Spillway shown at upper right. Himix Plant at lower left, and Government Head Tower at lower right. April 17th, 1934 Pg.29 #2643 Unloading 81/2 ft. I.D. Valve House outlet pipe, with the Government Cableway. View taken on the Nevada Side, looking upstream. April 24th, 1934. Pg.28 #2625 Track layout above Himix and Cement Blending Plants, showing bins where rock and sand are dumped. April 17th, 1934.