Image
Well No. 2 had dropped production from 2.5 million gallons a day to 700,000 gallons, and Bracken discussed possible remedies.
Text
View of the "new" Reno Arch with lit neon at night. The sign was installed in 1987 but was remodeled in 2018, shown here.
345 N Virginia St, Reno, NV 89501
Image
Image
Image
Archival Component
Bracken briefing Jeffers on the production problems with Well No. 2, a possible rate increase due to evaporative water coolers, and the water shortage in Las Vegas
Text