This set includes: panoramic photo collage, redlining, electrical plan, exterior perspectives, index sheet, site plans, preliminary sketches, landscape plans, floor plans, interior elevations, construction details, reflected ceiling plans, lighting plans, roof plans, exterior elevations and structural calculation report.
This set includes drawings for Jack Matthews (client) by MSA Engineering, Inc (engineer)
This set includes drawings for Story Church Building for Faith Baptist Church at Smithridge Drive (Reno, Nevada).
Archival Component
Mr. Montgomery, a consulting engineer, recommends that Mr. Campbell, president of the Las Vegas Valley Water District, authorizes the Las Vegas Land and Water Company to develop and acquire new water facilities to meet community water supply needs.
Text
Image
Plan for reconstruction and additions for the New Frontier in 1960.Site Name: FrontierAddress: 3120 Las Vegas Boulevard South