Looking upstream at the dam site, Hoover Dam, January 1933. Construction materials and small bridges line the canyon above the river as the dam is being built.
Date handwritten in lower right corner. Eagle Hills at Summerlin. Lot no. 37. Sheet 1 of 1. Elevations base on Horizon Surveys drawing "Sparer" 5/15/95, sheet 1 of 1. Job number: 85528
Union Plaza Hotel and Casino will be built on this site right next to the Union Pacific Railroad Station on Main Street at the end of Fremont. In the background on the left you can see railroads.