Bracken stated that water from reservoir and spring was flowing, but was being absorbed into the ground as it flowed through a bed of tuilleries. In order for water to reach the Stewart burial plot and avoid a lawsuit threatened by Stewart heirs, Bracken recommended that the company dredge the ditch from the Main Street bridge to weir at dam.