Photographer's notes: "The second of the final four tub girders is flown into position via the highline crane, April 15, 2010." Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Photographer's notes: "The final tub girder of the bridge's construction appears to be moving into position for installation, but it is really being brought into position for a photo opportunity by the ironworkers, April 15, 2010." Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Photographer's notes: "Ironworkers from Arizona Local 75. California/Nevada Local 433 and management pose for snapshots before the final tub girder is flown into position by the highline crane, April 15, 2010." Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Photographer's notes: "The final tub girder of the bridge's construction is brought into position, April 15, 2010. Note: I desired to switch my location for these final installation shots, but it would have been impossible to relocate to the top of another cliff in time to document the event. Nobody consults the photographer about the 'best time of day' to accomplish some tasks!" Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Photographer's notes: "The final tub girder of the bridge's construction is brought into position, April 15, 2010. Note: I desired to switch my location for these final installation shots, but it would have been impossible to relocate to the top of another cliff in time to document the event. Nobody consults the photographer about the 'best time of day' to accomplish some tasks!" Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Photographer's notes: "With all of the tub girders installed for the bridge its functional structure was complete. Only the roadbed remained to complete. April 15, 2010." Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge