Information
Creator
Creator: Stillings, Jamey
Date
2010-04-15
Description
Photographer's notes: "The final tub girder of the bridge's construction is brought into position, April 15, 2010. Note: I desired to switch my location for these final installation shots, but it would have been impossible to relocate to the top of another cliff in time to document the event. Nobody consults the photographer about the 'best time of day' to accomplish some tasks!" Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Digital ID
jsc000208
Physical Identifier
20100415_js_13237_unlv