Level of Description
File
Identifier
MS_01016_206
Scope and Contents
Local news anchor discusses tower construction and reaction to crooked tower leg; Tutor Perini construction took over after two mistakes cost Stupak millions; interview with local residents and their reaction to the tower's size and shape; crew has 7 months left to finish construction of cement tower "legs". Original media VHS, color, aspect ratio 4 x 3, frame size 720 x 486.
Date
1993-05-06
Extent
1 digital_files (.MP4)
1 vhs_tapes
Container
To request this item in person:
Collection Number: MS-01016
Collection Name: Bob Stupak Professional Papers
Box/Folder: Digital File 00, Box 41
Collection Name: Bob Stupak Professional Papers
Box/Folder: Digital File 00, Box 41
Administrative Information
English