Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
LOS ANGELES & SALT LAKE RAILROAD COMPANY W.O. 1813. Drilled 2 wells Nos. 5 and 6, depth 4-92 ft. and 500 ft. respectively, with furnishings and well easings. Constructed 2 high wooden derreeks 12”xl2"x35" on concrete foundation. Constructed 12”x20” concrete mats at each well. Constructed necessary pipe lines from new wells to connect with existing lines. Installed 2 Byron Jackson deep well suhmergeable turbine pumps complete with 440V 3-phase 60 cycle 4-0 HP motors. Installed power line with transformers and constructed circuit and installed telemeter. Replaced 954- ft. of 24-” wood stave pipe line and fittings with 954 ft. of 24" welded steel pipe and fittings from settling basin to reservoir. Detail of Charges Operating Pipe - size and kind: 174’ of 12” transite pipe 440* of 10" 0,1. ” 15* of 10" W.I. ” 44t of 8” Std.steel " 281346..0604 5563..2609 Investment 1 160.53 Expenses Steel pipe replacing wood stave pipe: 954* of 24” welded steel pipe 3 663.36 Cost at current prices of 954’ of wood stave pipe and fittings, ineluding percentages 2 700.00 2 700.00 Well easings: 570’ of 13-3/8" casing, steel 1 472» Cuotft i1n0g- 31/ 44” 0 ft" . length” Perforating and threading 2 Baker float shoes 681.62 855.01 33.65 230105..9931 3 087.12 Fittings and Miscellaneous Material: 4 C.I. Bends 10” 12.10 48.40 1 12x12x10° Cl Wye branch 43.12 2 Reducers 13-3/8°to 12” 70.66 1 C.I. Std. screw cross 12" 14.50 1 Std. Bull plug 12” 14.69 4 Swedge nipples 10x12” 13.93 55.72 1 Nipple 12-3/4x16" 1.78 1 C.I. screw cross 12” 41*33 4 Steel nipples 8x12” 3.62 14*48 4 Wedge gate flange 8" 24.27 97.08 1 C.I. sleeve 12" 12.59 1 C.I. 12x12x12” Hub Wye branch 52.11 500 Sacks oil well cement 237.25 70 Carriage bolts 5/8x12” .07 4*90 3664 ”” ”" f|xx43"a " *.0022 1..2782