Skip to main content

Search the Special Collections and Archives Portal

upr000274 15

Image

File
Download upr000274-015.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000274-015
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

LOS ANGELES & SALT LAKE RAILROAD COMPANY W.O. 1813. Drilled 2 wells Nos. 5 and 6, depth 4-92 ft. and 500 ft. respectively, with furnishings and well easings. Constructed 2 high wooden derreeks 12”xl2"x35" on concrete foundation. Constructed 12”x20” concrete mats at each well. Constructed necessary pipe lines from new wells to connect with existing lines. Installed 2 Byron Jackson deep well suhmergeable turbine pumps complete with 440V 3-phase 60 cycle 4-0 HP motors. Installed power line with transformers and constructed circuit and installed telemeter. Replaced 954- ft. of 24-” wood stave pipe line and fittings with 954 ft. of 24" welded steel pipe and fittings from settling basin to reservoir. Detail of Charges Operating Pipe - size and kind: 174’ of 12” transite pipe 440* of 10" 0,1. ” 15* of 10" W.I. ” 44t of 8” Std.steel " 281346..0604 5563..2609 Investment 1 160.53 Expenses Steel pipe replacing wood stave pipe: 954* of 24” welded steel pipe 3 663.36 Cost at current prices of 954’ of wood stave pipe and fittings, in­eluding percentages 2 700.00 2 700.00 Well easings: 570’ of 13-3/8" casing, steel 1 472» Cuotft i1n0g- 31/ 44” 0 ft" . length” Perforating and threading 2 Baker float shoes 681.62 855.01 33.65 230105..9931 3 087.12 Fittings and Miscellaneous Material: 4 C.I. Bends 10” 12.10 48.40 1 12x12x10° Cl Wye branch 43.12 2 Reducers 13-3/8°to 12” 70.66 1 C.I. Std. screw cross 12" 14.50 1 Std. Bull plug 12” 14.69 4 Swedge nipples 10x12” 13.93 55.72 1 Nipple 12-3/4x16" 1.78 1 C.I. screw cross 12” 41*33 4 Steel nipples 8x12” 3.62 14*48 4 Wedge gate flange 8" 24.27 97.08 1 C.I. sleeve 12" 12.59 1 C.I. 12x12x12” Hub Wye branch 52.11 500 Sacks oil well cement 237.25 70 Carriage bolts 5/8x12” .07 4*90 3664 ”” ”" f|xx43"a " *.0022 1..2782