Skip to main content

Search the Special Collections and Archives Portal

upr000262 191

Image

File
Download upr000262-191.tif (image/tiff; 26.29 MB)

Information

Digital ID

upr000262-191
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

% S*stl2B 5(a) 5(b) 5(c) 5(d) 5(e) 5(f) 5(g) 5(h) 5 (i) 5( j) 50c) 5(1) RELOCATION M R I PER AGKEaffiHT C.L.D, 1X342 Description Construct 39" pipe line between points A A V and Y A K Construct 24" pipe line between points K A E Construct 8" pipe line between points T A D Relocate punp station from point HH to point near R Construct 14" pipe line between points 3, T and U Construct 6" pipe line between J A 00 (if not already constructed) Construct power line between points D A T and T A V R o b o t e pipe line between points KK A LL Reewjre pipe line between points II A JJ Robots power line between points AA A BB and FF A HH Robots power lines, telephone circuits ynri telemeter wires between points CC A GO Robots pipe lines between points A A E, A A K, and R A HH Remarks Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Removed wider Spec. 1, Fisher Contracting Co, Abandoned and not re-installed at point R« Completed October 18, 1955* Under Spec, 1, Fisher Contracting Co. Completed- October 18, 1955. Constructed prior to purchase. Mot necessary. Under Spec, 1, Fisher Contracting Co, Completed. - October 18, 1955. Under Spec, 1, Fisher Contracting Co. CoexistedOctober 18, 1955. Removed by Southern Nevada Power Co, Complete December If55, except trans­former pole at old pump eta, site B U Removed by Southern Nevada Power Co, Complete DeccB&er 1955* All except line between R A M rmaoved under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Line from R to HH left in at request of U, P., subject to granting of suitable easeswnt.