Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
More Info
Rights
Digital Provenance
Publisher
Transcription
% S*stl2B 5(a) 5(b) 5(c) 5(d) 5(e) 5(f) 5(g) 5(h) 5 (i) 5( j) 50c) 5(1) RELOCATION M R I PER AGKEaffiHT C.L.D, 1X342 Description Construct 39" pipe line between points A A V and Y A K Construct 24" pipe line between points K A E Construct 8" pipe line between points T A D Relocate punp station from point HH to point near R Construct 14" pipe line between points 3, T and U Construct 6" pipe line between J A 00 (if not already constructed) Construct power line between points D A T and T A V R o b o t e pipe line between points KK A LL Reewjre pipe line between points II A JJ Robots power line between points AA A BB and FF A HH Robots power lines, telephone circuits ynri telemeter wires between points CC A GO Robots pipe lines between points A A E, A A K, and R A HH Remarks Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Removed wider Spec. 1, Fisher Contracting Co, Abandoned and not re-installed at point R« Completed October 18, 1955* Under Spec, 1, Fisher Contracting Co. Completed- October 18, 1955. Constructed prior to purchase. Mot necessary. Under Spec, 1, Fisher Contracting Co, Completed. - October 18, 1955. Under Spec, 1, Fisher Contracting Co. CoexistedOctober 18, 1955. Removed by Southern Nevada Power Co, Complete December If55, except transformer pole at old pump eta, site B U Removed by Southern Nevada Power Co, Complete DeccB&er 1955* All except line between R A M rmaoved under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* Line from R to HH left in at request of U, P., subject to granting of suitable easeswnt.