Skip to main content

Search the Special Collections and Archives Portal

upr000262 175

Image

File
Download upr000262-175.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000262-175
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    SgSffira 3 place* Balance of tills line from angle point to west line of Main Street at point M was not removed except that Taira at angle point was removed and meter with valve assembly and meter box near K B Freight House was removed* I recommend that portion of pipe line between angle point west of track and point If at Main Street be left in plaoe and no exception taken* (2) Pipe line A to 1 was removed except 60 ft* of pipe under pavement in Highway 95* Bee ay comments under portion of line A to & whioh also apply to portion of pipe left under pavement at this point* (3) Flpe line R to H*H* was not removed* Underground piping extending from 14n pips line to site of former pumping station at BH was not removed as valve was found at surface of ground near previous loca­tion of pumps. Mr* Renshaw advised that he will arrange to have this piping and valve removed and will plug end of 14** pipe* Exhibit A shows that 14** pipe line from E to connec­tion to pumping station at HH is to be removed but HR Co, has requested District, and they have agreed, not to remove this 14” line since it will serve as a distribu­tion main to ly thereof* serve RR Co* Industrial development easter­Last paragraph of 3ee« 5 page 20 states that con­tractors shall be paid in full before funds held in "Relocation Fund" are released from Escrow* I suggest that District be con­tacted regarding status of contract payments. Last paragraph on page 16 of Agreement Sec. 5 deals with depth of pipe* The District submitted construction plana to RE Co* whioh show elevations of ground and pipe and I believe all of these plans wore approved for the RR Co* by Mr. R. L* Adamson*