Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
More Info
Rights
Digital Provenance
Publisher
Transcription
SgSffira 3 place* Balance of tills line from angle point to west line of Main Street at point M was not removed except that Taira at angle point was removed and meter with valve assembly and meter box near K B Freight House was removed* I recommend that portion of pipe line between angle point west of track and point If at Main Street be left in plaoe and no exception taken* (2) Pipe line A to 1 was removed except 60 ft* of pipe under pavement in Highway 95* Bee ay comments under portion of line A to & whioh also apply to portion of pipe left under pavement at this point* (3) Flpe line R to H*H* was not removed* Underground piping extending from 14n pips line to site of former pumping station at BH was not removed as valve was found at surface of ground near previous location of pumps. Mr* Renshaw advised that he will arrange to have this piping and valve removed and will plug end of 14** pipe* Exhibit A shows that 14** pipe line from E to connection to pumping station at HH is to be removed but HR Co, has requested District, and they have agreed, not to remove this 14” line since it will serve as a distribution main to ly thereof* serve RR Co* Industrial development easterLast paragraph of 3ee« 5 page 20 states that contractors shall be paid in full before funds held in "Relocation Fund" are released from Escrow* I suggest that District be contacted regarding status of contract payments. Last paragraph on page 16 of Agreement Sec. 5 deals with depth of pipe* The District submitted construction plana to RE Co* whioh show elevations of ground and pipe and I believe all of these plans wore approved for the RR Co* by Mr. R. L* Adamson*