Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
x OCT ^ September 16, 1954 1-7334 Hr* James M. Montgomery* Consulting Engineer, 15 Horth Oakland Avenue, Pasadena, California Dear Mr. Montgomerys Please refer to our conversations relative to the Las Vegas Valley Water District abandoning the use of the l6iineh water main between points K and M as shown by solid red line on Exhibit "A" accompanying agreement between the Railroad Companies, Las Vegas Land and Water Company and the District dated June 1, 1953* I understand that the District will construct a 30-inch pipeline between points TTCf and M, as shown by the solid green line on the attached prints of Dwg. 1-128 dated September 13, 1954, for which easement right of way is required* We propose to prepare an agreement substantially as outlined below to supplement the agreement of June 1, 1953* (1) LA&SLRRCo. and Its lessee, Onion Pacific RR Co., to promptly grant to the District an easement 1 5 feet in width for the pipeline from M to DO, shown by solid green line on the attached printf and an easement 15 feet in width for pipeline from TT to VV, shown by solid yellow line on the print. (2) District to construct 30-inch pipeline from M , to 00 within a period of two years from the sale date in accordance with provisions of Section 5 of the agreement of June 1, 1953* (3) District to remove 16-inch pipeline from easement strip K to M upon completion of 30-inch water main in accordance with provisions of Section 5 of the agreement of June 1^ 1953* - L j B, E, 0 , H__ ill 17 1§S4 ***** -17'iS54,a 'U-C,'C, i 1 8