Skip to main content

Search the Special Collections and Archives Portal

upr000255 259

Image

File
Download upr000255-259.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000255-259
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    B a ^ COPY ? LAS VEGAS VALLEY WATER DISTRICT LAS VEGAS, NEVADA PROPOSED IMPROVEMENTS ESTIMATE OP COST 30-Million gallon reservoir in West Las Vegas l^-Million gallon reservoir at Manganese Ores Control building at Manganese Ores Booster pumping station on U.S. Highway 95 Pipeline from Manganese Ores to 30-million gallon reservoir Pipeline from Fremont Street to 30-million gallon reservoir via Charleston Boulevard Miscellaneous improvements to production facilities New water wells Improvements to increase capacity of 40-inch pipeline from Lake Mead to Henderson Miscellaneous additional transmission pipelines Miscellaneous additional improvements to distribution system Total estimated construction cost $ Contingencies Purchase of existing water system from Union Pacific R.R. Acquisition of sites, rights-of-way, easements, etc. Total acquisition and construction costs $ 710,000 85,000 53,500 197,000 1,661,500 292,000 133,000 68,000 620,000 555.000 632.000 5,007,000 262.000 2,500,000 50,000 Total incidental expenses, including return of loans from county, working capital, engineering, legal and miscellaneous $ 7 ,819,000 535,000 Grand Total $ 8,354,000