Information
Digital ID
upr000255-259
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.B a ^ COPY ? LAS VEGAS VALLEY WATER DISTRICT LAS VEGAS, NEVADA PROPOSED IMPROVEMENTS ESTIMATE OP COST 30-Million gallon reservoir in West Las Vegas l^-Million gallon reservoir at Manganese Ores Control building at Manganese Ores Booster pumping station on U.S. Highway 95 Pipeline from Manganese Ores to 30-million gallon reservoir Pipeline from Fremont Street to 30-million gallon reservoir via Charleston Boulevard Miscellaneous improvements to production facilities New water wells Improvements to increase capacity of 40-inch pipeline from Lake Mead to Henderson Miscellaneous additional transmission pipelines Miscellaneous additional improvements to distribution system Total estimated construction cost $ Contingencies Purchase of existing water system from Union Pacific R.R. Acquisition of sites, rights-of-way, easements, etc. Total acquisition and construction costs $ 710,000 85,000 53,500 197,000 1,661,500 292,000 133,000 68,000 620,000 555.000 632.000 5,007,000 262.000 2,500,000 50,000 Total incidental expenses, including return of loans from county, working capital, engineering, legal and miscellaneous $ 7 ,819,000 535,000 Grand Total $ 8,354,000