Information
Digital ID
upr000254-239
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.LOS ANGELES & SALT LAKE RAILROAD COMPANY Statement !©o 1 Amounts charged to the Investment Account during the period January 1, 1952 to September la 1952 for additions and betterments to or extensions of water production facilities at Las Vegas2 Nevada, which additions and betterments were completed prior to September l g 1952 4728 Install pump and motor on wells No© 8, 10 and 11$ extend power circuit and rearrange existing piping connections $ 4789 Construct booster pumping station including two pumps and 2400 .ft© 14n transits water pipe line to connect with LVL&W Cocfs proposed pipe line in Bonanza Road* to W o0© Expended Jan© 19 1952 to Sept© ;uos ttmheen tpse rAipopdl ipcraibolre No© Description of the Work 1, 1952 to Jan© 1„ 1952 Total serve West Side District Total $ 198©13 195a28 $ 2 620©60 # 2 4 2 2 © 4 7 Auditor of Disbursements* Office& Omahaa Nebraska^ May 60 1953