Skip to main content

Search the Special Collections and Archives Portal

upr000254 239

Image

File
Download upr000254-239.tif (image/tiff; 23.4 MB)

Information

Digital ID

upr000254-239
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    LOS ANGELES & SALT LAKE RAILROAD COMPANY Statement !©o 1 Amounts charged to the Investment Account during the period January 1, 1952 to September la 1952 for additions and betterments to or extensions of water production facilities at Las Vegas2 Nevada, which additions and betterments were completed prior to September l g 1952 4728 Install pump and motor on wells No© 8, 10 and 11$ extend power circuit and rearrange existing piping connections $ 4789 Construct booster pumping station including two pumps and 2400 .ft© 14n transits water pipe line to connect with LVL&W Cocfs proposed pipe line in Bonanza Road* to W o0© Expended Jan© 19 1952 to Sept© ;uos ttmheen tpse rAipopdl ipcraibolre No© Description of the Work 1, 1952 to Jan© 1„ 1952 Total serve West Side District Total $ 198©13 195a28 $ 2 620©60 # 2 4 2 2 © 4 7 Auditor of Disbursements* Office& Omahaa Nebraska^ May 60 1953