Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
1 Reamed hole with 12-3/8" Crum h it and made 10' o f new hole to 776. Made 2nd attempt to run same 10-3/4" perforated lin e r , 283.81' long, but without success. Started running lin e r at 7:15 P .M ., March 26th. Shoe stopped at 638. Started p u llin g lin e r out o f hole at 10:05 P.M. the same day. Under-reamed hole from shoe o f 13-3/8" to 775 with 13-3/8" Baker w a ll scraper. Made 3rd attempt to run 10-3/4" lin e r , 283.81' long, but without success. Started running lin e r at 11:40 P .M ., March 27th. Liner started hanging up at 572. Shoe o f lin e r was worked down to 647 but could not be worked below that depth. Started p u llin g lin e r out o f hole at 4:03 A.M ., March 28th. 3/28/42 - Re-scraped hole with 13-1/2" Baker w all scraper to 776. ? 3/29/42 - Ran 10-3/4" O.D. - 46# A. 0. Smith (Security Engineering C o .'s flu s h jo in t threads) 283.81' long, including settin g mandrel on top. Bottom o f bottom jo in t v;as welded closed to form guide shoe. A ll o f lin e r was perforated 60 mesh, 6" centers, 2" s lo t s , 18 rows. Liner consisted o f 8 jo in ts including settin g mandrel. Started running lin e r at 5:15 P.M. Liner stopned at 760.50 and was set with the shoe at that depth. Finished settin g lin e r at 3:30 P.M ., March 29, 1942 Well completed March 29, 1942. Note: A ll w e ll measurements including casing are based on being taken froln the top o f the rotary ta b le . Top o f rotary tabLe is 5 .5 ' above cement matt.