Skip to main content

Search the Special Collections and Archives Portal

upr000221 119

Image

File
Download upr000221-119.tif (image/tiff; 26.83 MB)

Information

Digital ID

upr000221-119
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 Reamed hole with 12-3/8" Crum h it and made 10' o f new hole to 776. Made 2nd attempt to run same 10-3/4" perforated lin e r , 283.81' long, but without success. Started running lin e r at 7:15 P .M ., March 26th. Shoe stopped at 638. Started p u llin g lin e r out o f hole at 10:05 P.M. the same day. Under-reamed hole from shoe o f 13-3/8" to 775 with 13-3/8" Baker w a ll scraper. Made 3rd attempt to run 10-3/4" lin e r , 283.81' long, but without success. Started running lin e r at 11:40 P .M ., March 27th. Liner started hanging up at 572. Shoe o f lin e r was worked down to 647 but could not be worked below that depth. Started p u llin g lin e r out o f hole at 4:03 A.M ., March 28th. 3/28/42 - Re-scraped hole with 13-1/2" Baker w all scraper to 776. ? 3/29/42 - Ran 10-3/4" O.D. - 46# A. 0. Smith (Security Engineering C o .'s flu s h jo in t threads) 283.81' long, including settin g mandrel on top. Bottom o f bottom jo in t v;as welded closed to form guide shoe. A ll o f lin e r was per­forated 60 mesh, 6" centers, 2" s lo t s , 18 rows. Liner consisted o f 8 jo in ts including settin g mandrel. Started running lin e r at 5:15 P.M. Liner stopned at 760.50 and was set with the shoe at that depth. Finished settin g lin e r at 3:30 P.M ., March 29, 1942 Well completed March 29, 1942. Note: A ll w e ll measurements including casing are based on being taken froln the top o f the rotary ta b le . Top o f rotary tabLe is 5 .5 ' above cement matt.