Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
UNION PACIFIC RAILROAD COMPANY Las Vegas, Nevada Water Well #8 History Location: 290' South and 728* West o f E j Corner, Section 51, 20-61, M. D. E. & M. Elevation: 2126’ (Cement Matt) 3/17/42 - Spudded at 1:00 P.M. D rille d 20-3/4" hole from 0 to 24.55, 3/20/42 3/21/42 3/22/42 D rilled 18-1/4" bole to 510. Attempted to run 13-5/8" - 48/ South Chester Tube C o .'s lapweld, screw easing. Started runnirr casing at 11:15 P.M ., March 20th. Casing started hanging up occasionally from 90' down; when shoe had reached 416* at 5:05 A.M., March 26th, the caning became loggy when p u llin g upward to free s lip s . A ll o f 13-3/8" casing was then pulled out. Hole was reamed with 18-1/4" Crum bit end 3 additional feet of hole made to 513. Ren 538.26* o f 13-3/8" - 43/ South Chester Tube Co..' r lapweld, short thread, 8-V thread casin'-* no cemented shoe o f some at 510.57, using 388 sacks of Victor Modified Cement, none treated. Baker cement flo a t shoe on bottom o f casing. The cement was mi red and pumped down by the rig's, crew and punas, using tv.'O Perk inn plugs. The shoe of the 13-5/8" casing wfs f i r t, r -r to 511, then pulled up to 510.57 and heln there while pumping out the cement. Started running casing at 1:00 / , ' arch 22nd. Finished, cementing at 8:42.A.M., Merer, 2f:no. Ccmirg stood cemented 36 hours. R anin vdtl L2-3/3" Crur b i t . md to • r 4:^-0 • r r . livS/9* ahead w ith '12-3/8" b it . With bottom o f hole at 766, attempted to run ir. 1 lin e r 283.81' J.cnr. Started running ilr.er at If: March 25th. Could not work shoe of * Iren helor Started p u llin g 10-5/4" lin e r out of hoi* at 12:4 March 26th.