Skip to main content

Search the Special Collections and Archives Portal

upr000221 118

Image

File
Download upr000221-118.tif (image/tiff; 25.8 MB)

Information

Digital ID

upr000221-118
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    UNION PACIFIC RAILROAD COMPANY Las Vegas, Nevada Water Well #8 History Location: 290' South and 728* West o f E j Corner, Section 51, 20-61, M. D. E. & M. Elevation: 2126’ (Cement Matt) 3/17/42 - Spudded at 1:00 P.M. D rille d 20-3/4" hole from 0 to 24.55, 3/20/42 3/21/42 3/22/42 D rilled 18-1/4" bole to 510. Attempted to run 13-5/8" - 48/ South Chester Tube C o .'s lapweld, screw easing. Started runnirr casing at 11:15 P.M ., March 20th. Casing started hanging up occasionally from 90' down; when shoe had reached 416* at 5:05 A.M., March 26th, the caning became loggy when p u llin g upward to free s lip s . A ll o f 13-3/8" casing was then pulled out. Hole was reamed with 18-1/4" Crum bit end 3 additional feet of hole made to 513. Ren 538.26* o f 13-3/8" - 43/ South Chester Tube Co..' r lapweld, short thread, 8-V thread casin'-* no cemented shoe o f some at 510.57, using 388 sacks of Victor Modified Cement, none treated. Baker cement flo a t shoe on bottom o f casing. The cement was mi red and pumped down by the rig's, crew and punas, using tv.'O Perk inn plugs. The shoe of the 13-5/8" casing wfs f i r t, r -r to 511, then pulled up to 510.57 and heln there while pumping out the cement. Started running casing at 1:00 / , ' arch 22nd. Finished, cementing at 8:42.A.M., Merer, 2f:no. Ccmirg stood cemented 36 hours. R anin vdtl L2-3/3" Crur b i t . md to • r 4:^-0 • r r . livS/9* ahead w ith '12-3/8" b it . With bottom o f hole at 766, attempted to run ir. 1 lin e r 283.81' J.cnr. Started running ilr.er at If: March 25th. Could not work shoe of * Iren helor Started p u llin g 10-5/4" lin e r out of hoi* at 12:4 March 26th.