Skip to main content

Search the Special Collections and Archives Portal

upr000221 36

Image

File
Download upr000221-036.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000221-036
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    UNION PA C IF IC RAILROAD COMPANY L a s V e g a s , N evada Location: Water W ell No. 11 1377.97* North and 969.05* West from Southeast corner o f Section 31, T. 20 S .; R. 61 E; M.D.B. & M. Elevation : 2129.5* Spudded: 12:00 Noon, 9/17/45 Completed: 9/26/45 Total Depth: 9401 CASING RECORD 10-3/4" O.D. - 35.75# & 45.5# easing hung w ith shoe at 90 4'. C.P. at 538'. Top at su rface. 10-3/4" casing p erfo rated : 541* - 747*; And 807' - 902' 160 mesh. S HISTORY NOTE: A l l measurements, both formation & casing, are from top o f K e lly Bushings. K e lly Bushings are 72" ( 6 . O’ ) above cement mat. 9/17/45 9/19/45 Spudded in at 12:00 Noon, using a 15-1/2" b it Started c o lle c tin g ditch samples 360*. C ollected diteh samples 9/22/45 every 10 fe e t from 360* to f i n a l depth o f hole. With bottom o f hole at 794*, reamed hole with 15-1/2" b it from 600* to 630* and from 745* to 794*. Then continued d r i lli n g ahead 9/23/45 w ith 15-1/2" b i t . Finished making hole w ith 15-1/2" b it to 940’ , the fin a l depth. 9/24/45 Started reaming hole. Finished reaming hole w ith 15-1/2" b it then conditioned mud and ran 10-3/4" casing as fo llo w s: Hung new perforated and blank 10-3/4" O.D. -35.75# & 45.5# A.O. Smith and Republic, 8 round thread casing w ith shoe at 9 0 4 '. C.P. at 538.19*. Top o f 10-3/4"casing is at the su rface. From bottom up, the 10-3/4" O.D. casing is made up as fo llo w s: Bottom o f casing is welded closed to form a guide shoe, then 2*. 0" o f blank, then 94.94* p erfo rated , then 60.33* blank, then 205.94* p e rfo rated . Above the 205.94* o f perforated pipe i s a 3 .0 ' blank nipple upon which is in s t a lle d a 10-3/4" x 15-1/2" Weatherford Cement basket w ith the top o f the bottom staves 20-1/2" below the top o f the blank n ip p le . In ad dition , the 3.0* nipple has a C al-S ea l and Cement (mixed) b a f f le on the in s id e . 8 holes approximately 1/2" x 2" were cut with an acetylene torch 5" below the top o f the n ip p le . The