Information
Digital ID
upr000218-304
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles, October 10, 19^7 Mr. V. W. Smith: Herewith "As Constructed” quantities for W.O. 31^0-1, water facilities at Las Vegas, Nev. The costs shown include only that portion of the cost of labor and material furnished by contractors. A brief summary of the division of expense for the various phases of work performed under this W.O. as between Company forces and contractors* forces is as follows: R. R. Co. Expense Pipe Line: (1) Unload and distribute pipe to Job site. (2) Unload pipe fittings. (3) Excavate trench and lay 2^H C.I.P. under R.R. Tracks. (4-) Furnish all pipe material and fittings, valves, etc. Booster Pump House: (1) Furnish pumps, motors and pipe fittings, valves, etc. (2) Furnish all electrical labor and material. (3) Furnish and install sump, pump Fire Pump House: (1) Furnish and install pump, motor, control panel, pipe, valves, etc. (2) Furnish all eleotrical labor and material. Reservoir: (1) Furnish overflow pipes and outlet piping. Contract Work Pipe Line: (1) Excavate and backfill trench. (2) Lay pipe and fittings. (3) Construct valve boxes, etc. (M-) Chlorinate pipe line. Booster Pump House: (1) Construct building. (2) Install pumps, motors and pipe fittings, valves, eto. except sump pump. Fire Pump House: (1) Construct building. Reservoir: Construct reservoir.