Skip to main content

Search the Special Collections and Archives Portal

upr000218 304

Image

File
Download upr000218-304.tif (image/tiff; 23.24 MB)

Information

Digital ID

upr000218-304
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Los Angeles, October 10, 19^7 Mr. V. W. Smith: Herewith "As Constructed” quantities for W.O. 31^0-1, water facilities at Las Vegas, Nev. The costs shown include only that portion of the cost of labor and material furnished by con­tractors. A brief summary of the division of expense for the various phases of work performed under this W.O. as between Company forces and contractors* forces is as follows: R. R. Co. Expense Pipe Line: (1) Unload and distribute pipe to Job site. (2) Unload pipe fittings. (3) Excavate trench and lay 2^H C.I.P. under R.R. Tracks. (4-) Furnish all pipe material and fittings, valves, etc. Booster Pump House: (1) Furnish pumps, motors and pipe fittings, valves, etc. (2) Furnish all electrical labor and material. (3) Furnish and install sump, pump Fire Pump House: (1) Furnish and install pump, motor, control panel, pipe, valves, etc. (2) Furnish all eleotrical labor and material. Reservoir: (1) Furnish overflow pipes and outlet piping. Contract Work Pipe Line: (1) Excavate and backfill trench. (2) Lay pipe and fittings. (3) Construct valve boxes, etc. (M-) Chlorinate pipe line. Booster Pump House: (1) Construct building. (2) Install pumps, motors and pipe fittings, valves, eto. except sump pump. Fire Pump House: (1) Construct building. Reservoir: Construct reservoir.