Skip to main content

Search the Special Collections and Archives Portal

upr000216 29

Image

File
Download upr000216-029.tif (image/tiff; 26.25 MB)

Information

Digital ID

upr000216-029
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    ESTABLI SHED I BBS C E N T U R Y 2 - 9 0 3 5 V 5 B B O A V A L D N B O U L E V A R D Los A n g e l e s 3 , C a l i f o r n i a February 10, 1946 Mr. Frank Strong Manager-Industrial Development Union Pacific Railroad Co. Los Angeles, California Dear Sir: Referring to our letter of January 10th, submitting guaranteed m a-rim uni proposal of $174*295 for construction of reservoir, settling basin, pipe lines, etc., Las Vegas: Section 3 of our proposal contemplated construction of the line in three sections, each section to be back-filled after testing, and Section 4 con­templated that we would be reimbursed for any additional expense incurred in event water was encountered in pipe line trenches. As you know, we have now encountered considerable water in the trench, re­quiring extra depth of excavation to accommodate gravel bed under a consider­able portion of the line, pumping, shoring, etc., thereby increasing our costs of pipe line work, together with necessity of holding the trench open to observe any settlement of pipe in unstable ground, requiring additional watchman service, protection lights, bridges, etc. for maintaining traffic. We are willing to proceed with the extra work involved upon the understand­ing that our guaranteed maximum cost will be increased by the sum of $42,990. If the above meets with your approval, will you please arrange for extra work order to cover. Yours very truly, McNEIL CONSTRUCTION CO. L. G. McNeil LGM:ob