Skip to main content

Search the Special Collections and Archives Portal

upr000215 96

Image

File
Download upr000215-096.tif (image/tiff; 23.44 MB)

Information

Digital ID

upr000215-096
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    X completed, except by order o f the Engineer. Cleaning Up Surplus pipe lin e m a te ria l, to o ls , and temporary structures s h a ll be removed by the C ontractor, and a l l d ir t , rubbish, and excess earth from excavations s h a ll be hauled to a dump provided by the Contractor and the construction s it e s h a ll be l e f t clean , to the s a tis fa c tio n o f the Engineer. C h lorin ation B efore being placed in s e r v ic e , a l l new water d is tr ib u ­tio n systems, or any valved se ctio n o f such water d is tr ib u ­tio n system, sh a ll be ch lorin ated in manner approved by Public Health A u th ority having ju r is d ic tio n . T ra n site Pipe Where a p p lic a b le, the fo r e g o in g S p e c ific a tio n s s h a ll apply to la y in g T ran site Pipe as in d ica ted on drawings. T ra n site pipe s h a ll be handled and in s ta lle d by Con­tr a c to r as recommended by Manufacturer! c " In s t a lla t io n Manual" DS S eries 332. B locking may be used i f in s ta lle d in accordance w ith above manual. Salvaged Pipe Contractor s h a ll salvage and reco n d itio n a l l tra n s ite and cast iro n pipe, which is to be removed as in d ica ted on drawings and in s t a ll in a new lo c a tio n portion s as in d ica ted . Balance o f salvaged pipe s h a ll be recon dition ed and hauled to R ailroad Company Store Dept, in Las Vegas. Contractor s h a ll secure su itab le equipment fo r sa lva g­in g e x is tin g tr a n s ite pipe and in s t a llin g in new lo c a tio n , and extreme care s h a ll be exercised to prevent breakage. 7/11/46 -5 -