Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
Mr* J* P* Mack: Los Angeles, November 12, 19^6 733^ (co - Mr. H. Crawford - L .V .) In connection with Work Order 3180, Las Vegas Water F a c ilitie s , I am submitting herewith, 2 prints of Drawing F»36l-3, dated November 1, 19^5» showing uncompleted portion o f pipe lin e work authorized under this work order. The work remaining to be completed under Work Order 3180, including pipe lin e work indicated on prin t, is summarized as follows: (1 ) Remove existing pipe lin e from Well 8 to Wells 9 and 10 as shown in black and white on attached prin t, haul salvaged pipe to store in Las Vegas and b a c k fill open trench* (2 ) Construct 12" 0*1. pipe lin e from Well No. 9 to Junction with lin e from Well 11 to settlin g basin as shown in cadmium color on attached prin t, using 1 2 * G »I. pipe salvaged from existing lin e Wells 9 to 10 and b a c k fill trench. (3 ) In sta ll f i r e pump and e le c tric a l panel in Fire Pump House* The fi r e pump is now available in the freigh t depot at Las Vegas and the eleotrioal panel w ill be received at an early date* Pipe fittin g s fo r fir e pump are on hand at Las Vegas Store. (k ) Check alignment of booster pumps in Booster Pump House a fte r electrical connections are completed* This item w ill be handled from my o ffic e * Please advise when eleotrioal connections are completed. (5 ) In s ta ll Drain Dri sump pump in Booster Pump House. This pump has not yet been received but delivery at Las Vegas is expected In January, 19*1-7. ( 6) In s ta ll transformers at Booster Pump House and oomplete in s t a lla tion o f power switches and connections to booster pumps. (7 ) In s ta ll fence with gate at transformers near Booster Pump House* This fence and gate has been requisitioned on Reqn. 6*1-232 and should be reoeived in Las Vegas in November. ( 8) In s ta ll l 6* check valves in l 6" main on east side of Ogden and Clark Street meters Immediately below the meters within the lim its of the meter by-pass. Pipe and fit t in g s fo r this work are available in Las Vegas Store. A ll work on this item should be held in abeyance un til a fte r the new booster pumps are ready to operate* Please consult with me when you are ready to plan work on this item. W H J . UOV 16 1946