Information
Digital ID
upr000211-121
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.V M E M O Mr. Mann advises pipeline from Lake Mead scheduled to deliver water to plant Apr. 1, 1943, meantime will need from LVL&WCo. by train haul - Temporary ca5rp~f«x—employb s. depending upon development. This may be increased during Feb. and March in 1300 units to possible maximum of 4800. This would mean possible addition of 353,000 G.P.D. but probable maximum for demand upon Water Co. will be an added - ------------------ -- - - ----- 84,000 f/YVPa&eent McNeil Construction demand 73.000 G.P.D., which may be increased during February t o - - -- — ---- -- 144,000 r\ wTOohstruction demand of Engrs. LTD. 60.000 G.P.D. Monday to Friday incl. 96.000 G.P.D. Saturday - maximum 96,000 house 1300 men @ 70 G.PlD 84,000 itUu l 408,000 Jan. 19, 1943 Las Vegas, Nevada.'