Skip to main content

Search the Special Collections and Archives Portal

upr000211 121

Image

File
Download upr000211-121.tif (image/tiff; 23.06 MB)

Information

Digital ID

upr000211-121
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V M E M O Mr. Mann advises pipeline from Lake Mead scheduled to deliver water to plant Apr. 1, 1943, meantime will need from LVL&WCo. by train haul - Temporary ca5rp~f«x—employb s. depending upon development. This may be increased during Feb. and March in 1300 units to possible maximum of 4800. This would mean possible addition of 353,000 G.P.D. but probable maximum for demand upon Water Co. will be an added - ------------------ -- - - ----- 84,000 f/YVPa&eent McNeil Construction demand 73.000 G.P.D., which may be increased during February t o - - -- — ---- -- 144,000 r\ wTOohstruction demand of Engrs. LTD. 60.000 G.P.D. Monday to Friday incl. 96.000 G.P.D. Saturday - maximum 96,000 house 1300 men @ 70 G.PlD 84,000 itUu l 408,000 Jan. 19, 1943 Las Vegas, Nevada.'