Information
Digital ID
upr000206-046
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.21 Sett lin e Basin 20" Wood Stave Pipe 40* Hoof over S ettlin g Basin Excelsior F ilt e r in " f o ter Softener Cos t .i)l ILew Parts to Heplaoe Parts Retired 24” Woo'd Stave Pipe 1016* Concrete connection 24" to 16" 16" Wood Stave Pipe 1808’ Connecting C ollars Store Expense Contingencies Gpsfc. at Cnrawat, Prices: of Parts Retired 12" V«C» Pipe { concrete encased) 1460* 16" V.CT. Pipe (concrete encased) 2178* Concrete aox' Forebay Store Expense # 900 28 105 v 1 000 112 195 $ 1 900 140 300 990 3 330 5 448 • 20 3 761 100 1 493 1 083 11 905 1 387 2 940 35 698 5 060 5 060 Pn era tin 1: Expense Work Laying 24" ¥ aS„ Pip© 1016* 545 Making oono, con. 24" to 16" 40 Laying 16" W*S, Pipe 1808* ~ 543 Connecting new with old 16" pipe 312 Trenching fo r 24" W.3. Pipe 1 815 Trenching 16" 17,3. Pip© 1808* 1 810 Hauling and handling fnater ial 250 Connect 12" pipe to se ttlin g basin 150 Raise 16" W.3. Pipe to grade 2100* 840 Contingencies 530 6 935 10 175 11 995 Total - $ 22 170