Skip to main content

Search the Special Collections and Archives Portal

upr000206 46

Image

File
Download upr000206-046.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000206-046
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    21 Sett lin e Basin 20" Wood Stave Pipe 40* Hoof over S ettlin g Basin Excelsior F ilt e r in " f o ter Softener Cos t .i)l ILew Parts to Heplaoe Parts Retired 24” Woo'd Stave Pipe 1016* Concrete connection 24" to 16" 16" Wood Stave Pipe 1808’ Connecting C ollars Store Expense Contingencies Gpsfc. at Cnrawat, Prices: of Parts Retired 12" V«C» Pipe { concrete encased) 1460* 16" V.CT. Pipe (concrete encased) 2178* Concrete aox' Forebay Store Expense # 900 28 105 v 1 000 112 195 $ 1 900 140 300 990 3 330 5 448 • 20 3 761 100 1 493 1 083 11 905 1 387 2 940 35 698 5 060 5 060 Pn era tin 1: Expense Work Laying 24" ¥ aS„ Pip© 1016* 545 Making oono, con. 24" to 16" 40 Laying 16" W*S, Pipe 1808* ~ 543 Connecting new with old 16" pipe 312 Trenching fo r 24" W.3. Pipe 1 815 Trenching 16" 17,3. Pip© 1808* 1 810 Hauling and handling fnater ial 250 Connect 12" pipe to se ttlin g basin 150 Raise 16" W.3. Pipe to grade 2100* 840 Contingencies 530 6 935 10 175 11 995 Total - $ 22 170