Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
s m . 4 ' SARBER-BRIDGE DRILLING CORP., LTD. Well Contractors 3020 Empire Avenue Burbank, California November 13# 1932 Onion P a c i f i c R ailro ad Company H I West S ixth S tre e t, Los Angeles 14, C a lifo r n ia A ttn: R. L. Adamson As p e r C ontract Dated October l6 . 1952: 10/19/32 Set up W ell R ig a t #2 W e ll - Hade up te s t pump - Swabbing W ell - Run pump bow ls in casin g Hours Rate Amount 11 12.00 132,00 1 0 /20/52 Running in Pump - Making up tubing 10 It 120.00 10/21/52 G ettin g pump ready to pump 2 1 24,00 10/22/52 Changing motors - t e s t pumping 3 H 3 6 .0 0 1 0 /2 3 /52 fin is h e d pumping l e t down r i g - moved equipment to w e ll #9 - Set up - fan b a i l e r in w e ll 11 • 132.00 10/24/52 Cleaned out 15! sand *> Ran pump in - S ta rte d pumping 11 • 1 3 2 .0 0 10/25/52 Test pumping 11 1 132.00 10/26/52 fin is h e d pumping - P u lle d out - Moved to next w e ll, #8 - Run in h o le 11 § 132.00 IO/2 7/5 2 m Running j a i l e r and swabbing - Pumping 10 120.00 10/28/52 F in ish ed pumping » P u lle d our pump •«* Run in O.P.R .R . Pump * L et down r i g 10 4t 120.00 10/29/52 Moved equipment to W ell #3 <* Set up r i g running in pump 10 « 120.00 10/31/52 fin is h e d running in pump - Started t e s t pumping - P u llin g pump 10 8 120.00 T o t a l ------ — 110 1320.00 Amount of this Bill taken into _We-Vj |__ Wltfc our t e.iogr am stii, co; ^T.ddk? ‘& SsSm : ___ .