Skip to main content

Search the Special Collections and Archives Portal

upr000198 180

Image

File
Download upr000198-180.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000198-180
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    s m . 4 ' SARBER-BRIDGE DRILLING CORP., LTD. Well Contractors 3020 Empire Avenue Burbank, California November 13# 1932 Onion P a c i f i c R ailro ad Company H I West S ixth S tre e t, Los Angeles 14, C a lifo r n ia A ttn: R. L. Adamson As p e r C ontract Dated October l6 . 1952: 10/19/32 Set up W ell R ig a t #2 W e ll - Hade up te s t pump - Swabbing W ell - Run pump bow ls in casin g Hours Rate Amount 11 12.00 132,00 1 0 /20/52 Running in Pump - Making up tubing 10 It 120.00 10/21/52 G ettin g pump ready to pump 2 1 24,00 10/22/52 Changing motors - t e s t pumping 3 H 3 6 .0 0 1 0 /2 3 /52 fin is h e d pumping l e t down r i g - moved equipment to w e ll #9 - Set up - fan b a i l e r in w e ll 11 • 132.00 10/24/52 Cleaned out 15! sand *> Ran pump in - S ta rte d pumping 11 • 1 3 2 .0 0 10/25/52 Test pumping 11 1 132.00 10/26/52 fin is h e d pumping - P u lle d out - Moved to next w e ll, #8 - Run in h o le 11 § 132.00 IO/2 7/5 2 m Running j a i l e r and swabbing - Pumping 10 120.00 10/28/52 F in ish ed pumping » P u lle d our pump •«* Run in O.P.R .R . Pump * L et down r i g 10 4t 120.00 10/29/52 Moved equipment to W ell #3 <* Set up r i g running in pump 10 « 120.00 10/31/52 fin is h e d running in pump - Started t e s t pumping - P u llin g pump 10 8 120.00 T o t a l ------ — 110 1320.00 Amount of this Bill taken into _We-Vj |__ Wltfc our t e.iogr am stii, co; ^T.ddk? ‘& SsSm : ___ .