Information
Digital ID
upr000187-063
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.7 3 - 3 ^ p' ;%:' :Airmail: Mr, W. M. Jeffers: Mr. B* H. Prater: Los Angeles - November 12, 1941 O F F IC E O F EXECUTIVE ASSISTANT NOV 1 3 1941 LOS ANGj&ES, CALIF, Mr, Jeffers* J-194 with respect to proposed budget item for chlorination facilities at Las Vegas, and other correspondence in connection with budget items for additional water facilities at that point, the undersigned, accompanied by Mr, Bracken, made an inspection on the ground November 7th as to physical conditions, and secured what information we could as to possibility of increased demand upon our water facilities during the next year. On November 10th we conferred with engineers for the manufacturers of chlorinating devices and pumping equipment, as result of which we submit the following Joint recommendation: Include In 1942 Budget the following items of expenditure: For Railroad Company: 1. fo recover some 300,000 to 400,000 OPB of water from Middle Spring, which water is now contaminated by vegetable organism and flowing in open ditch to the Las Vegas Ranch; install a Wallace & Tiernan wEquiscale Visual Vacuum Chlorlnator* with assemblies to provide a semi-automatic starting and stop operation, which will be connected into the present pump starting panel so that ehlorlnator operation will be synchronised (X)