Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Campbell Realty Company 135 Couth 4th Street Lae ?«gas, Nevada Att*nt Mr. Thomas A. Campbell September 29, 19^8 w 23-1-50 bear Mr. Campbells lour letter September 26th with attached print showing proposed extension of a 10- inch water line on Oakey Boulevard, fro® the existing line at the Intersection of South 5th Street, easterly to the northwest corner of Parcel 1 , shown on the prints Xu conversation today with Mr. laltenborn, he advisee he has Just received 1020 feet of 10-lneh east iron pipe which la available At #3.54 per foot, fob Las Vegas. Tide Is comparable with the current price ws pay for 10-inoh oast iron plus freight from Provo to Las -Vegas. 0m this basis and adding labor costs to install, plus & contingency Item to take care of jointing material, fittings, 1100 etc., estimate the feet which the print shows would cost $609^.00, In place. On the basis of the 1020 feet mentioned in your letter, the estimated cost would be 15650*00. Xf the installation were handled by the Water Company under our ueual refund arrangement, these estimates would be increased 1 Q$ to cover overhead and supervision. In explanation of conference with Mr. Kaften-born, X might add that the Pipe Company is now quoting us 12 months delivery on oast iron, whereas Mr. Salten-born* s pipe would be immediately available. Very truly yours, General 'Manager