Skip to main content

Search the Special Collections and Archives Portal

upr000172 249

Image

File
Download upr000172-249.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000172-249
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Campbell Realty Company 135 Couth 4th Street Lae ?«gas, Nevada Att*nt Mr. Thomas A. Campbell September 29, 19^8 w 23-1-50 bear Mr. Campbells lour letter September 26th with attached print showing proposed extension of a 10- inch water line on Oakey Boulevard, fro® the existing line at the Intersection of South 5th Street, easterly to the northwest corner of Parcel 1 , shown on the prints Xu conversation today with Mr. laltenborn, he advisee he has Just received 1020 feet of 10-lneh east iron pipe which la available At #3.54 per foot, fob Las Vegas. Tide Is comparable with the current price ws pay for 10-inoh oast iron plus freight from Provo to Las -Vegas. 0m this basis and adding labor costs to install, plus & contingency Item to take care of jointing material, fittings, 1100 etc., estimate the feet which the print shows would cost $609^.00, In place. On the basis of the 1020 feet mentioned in your letter, the estimated cost would be 15650*00. Xf the installation were handled by the Water Company under our ueual refund arrangement, these estimates would be increased 1 Q$ to cover overhead and supervision. In explanation of conference with Mr. Kaften-born, X might add that the Pipe Company is now quoting us 12 months delivery on oast iron, whereas Mr. Salten-born* s pipe would be immediately available. Very truly yours, General 'Manager