Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
/ + On Line - Peb. Jfc« TS3E SL ESP JffM 3L & OL copy SfOF SL & OL KR30 Lss Vdg&s met ESS RMJ JPK HH.L LA JEM VG Re furnishing water for Basic Magnesium. Past 14 days average 14 cars water delvd to McNeil, 5 cars to Fngrs Ltd. Meleil intimate may want to increase their supply ten more oars per day in near future, low have two Boulder Locals six days a week and on occasions have had three, also past two Sundays made special trip with water. McMeil has storage space as followss Six tanks, 60,000 gallons capacity each» lecy use tanks for this service that have 3 inch outlet and seal dome cover's. They require all their water ears to be sealed loaded and empty. They are using about 10 cars of water per day for culinary purposes and in fire protection; about 6 oars a day for watering their roads, claiming the dust causes sickness among their employes and necy keep dust down by watering their roads. We have asked them to oil their roads to conserve water inasmuch as we are short of tanka, insufficient facilities for loading so many oars and interference with yard operations. They advise will give this consideration. Shgrs Ltd who are contractors building the 30,000,000 gal reservoir that will be used to store water from the lake are using S cars per day and this is used to sprinkle the ground at the reservoir to pack the earth before they can do any concreting. We have been advised pipe line under construction and reservoir will be ready within 60 days, but It is our view will be at least 90 days. At present time we have