Skip to main content

Search the Special Collections and Archives Portal

upr000142 31

Image

File
Download upr000142-031.tif (image/tiff; 27.15 MB)

Information

Digital ID

upr000142-031
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    / + On Line - Peb. Jfc« TS3E SL ESP JffM 3L & OL copy SfOF SL & OL KR30 Lss Vdg&s met ESS RMJ JPK HH.L LA JEM VG Re furnishing water for Basic Magnesium. Past 14 days average 14 cars water delvd to McNeil, 5 cars to Fngrs Ltd. Meleil intimate may want to increase their supply ten more oars per day in near future, low have two Boulder Locals six days a week and on occasions have had three, also past two Sundays made special trip with water. McMeil has storage space as followss Six tanks, 60,000 gallons capacity each» lecy use tanks for this service that have 3 inch outlet and seal dome cover's. They require all their water ears to be sealed loaded and empty. They are using about 10 cars of water per day for culinary purposes and in fire protection; about 6 oars a day for watering their roads, claiming the dust causes sickness among their employes and necy keep dust down by watering their roads. We have asked them to oil their roads to conserve water inasmuch as we are short of tanka, insufficient facilities for loading so many oars and interference with yard operations. They advise will give this consideration. Shgrs Ltd who are contractors building the 30,000,000 gal reservoir that will be used to store water from the lake are using S cars per day and this is used to sprinkle the ground at the reservoir to pack the earth before they can do any concreting. We have been advised pipe line under construction and reservoir will be ready within 60 days, but It is our view will be at least 90 days. At present time we have