Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
More Info
Rights
Digital Provenance
Publisher
Transcription
Attached are forme 607 So*# K-27, 28 and 29, reporting additional mater isle chargeable to this work order* th» Baring* of approximately 8$ ie doe to the cost o f engineering end ooet of eonstruetlng power line with eeop&ny forces, being lw « than estimated. Brillod additional artesian moll Bo. 11* 10* x 740* deep. In ranlnlty o f w»U So. 9 . Constructed 1,200,000 gallon reinforced concrete reserrlor, One 16.6* x 91,6* reinforced concrete settling basin and 10466.1 ft of 24* 6 .1 , Pipe line from reeenrior to setd alang Charleston Bonlerard to Mala Street in Leo Vegas, Serada, Oonetraoted ono 26.0* x 3§«0* Reinforced Concrete end conereto bloote Puny Bouse, One 10* x 14* Concrete block end concrete f l or fire poop house. Installed 2 booster pumps, one fire pump and retired 222$ ft of existing pipe lines end reconstructed 2228 ft pips lines In new location, using 468,4 ft 24* tran sits, 146.2 ft 16* transits, 63.4 ft 16* C.X. Pipe, 219,8 ft 14* transits, 944,4 ft 12* Transits, 37,4 ft 12" M s Pipe and 354,0 ft 12* 8H 6*1, Pipe to soonest m ils Bb*s 9 , 10 and 11 to new reserrlor and sons true tod additional 8*8 ft 24* 6*1. and 65.8 ft 24” transit© pips connection to reserrlor. Constructed 117.7 ft 24* 0*1. and 336.1 f t 24* transit# pipe enter lin t by-pass around reserrlor. Constructed 5571 ft additional power lin e , installed now circuit on present polo line from old existing reserrlor to Power House. Installed $ - 2400 ro lt transformers at Reserrlor at Lao Vegas, Sereda, lorn Commenced 2-7-46 m at Completed 4-50-47. 40 Bata fe ta l anount paid contractor MeBeil Sousing Company under the Contrast 9232823.00., divided between structures and pipe linos as shewn below. Pipe Lines. #88060 Pump louse 8640 Keulraent 1450 lir e Pfcwp muse 2016 Reserrlor 96286 Poms 1225 Bottling Basin 8924 transformer Bat 200 Operating Shpenea 26814 total #232828 the fallowing is a brief euamary of the dirision of expense for the Brians units of work performed under this work order as between Genpsny forest and Contractor* forces.