Skip to main content

Search the Special Collections and Archives Portal

upr000115 211

Image

File
Download upr000115-211.tif (image/tiff; 23.12 MB)

Information

Digital ID

upr000115-211
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Attached are forme 607 So*# K-27, 28 and 29, reporting additional mater isle chargeable to this work order* th» Baring* of approximately 8$ ie doe to the cost o f engineering end ooet of eonstruetlng power line with eeop&ny forces, being lw « than estimated. Brillod additional artesian moll Bo. 11* 10* x 740* deep. In ranlnlty o f w»U So. 9 . Constructed 1,200,000 gallon reinforced concrete reserrlor, One 16.6* x 91,6* reinforced concrete settling basin and 10466.1 ft of 24* 6 .1 , Pipe line from reeenrior to setd alang Charleston Bonlerard to Mala Street in Leo Vegas, Serada, Oonetraoted ono 26.0* x 3§«0* Reinforced Concrete end conereto bloote Puny Bouse, One 10* x 14* Concrete block end concrete f l or fire poop house. Installed 2 booster pumps, one fire pump and retired 222$ ft of existing pipe lines end reconstructed 2228 ft pips lines In new location, using 468,4 ft 24* tran sits, 146.2 ft 16* transits, 63.4 ft 16* C.X. Pipe, 219,8 ft 14* transits, 944,4 ft 12* Transits, 37,4 ft 12" M s Pipe and 354,0 ft 12* 8H 6*1, Pipe to soonest m ils Bb*s 9 , 10 and 11 to new reserrlor and sons true tod additional 8*8 ft 24* 6*1. and 65.8 ft 24” transit© pips connection to reserrlor. Constructed 117.7 ft 24* 0*1. and 336.1 f t 24* transit# pipe enter lin t by-pass around reserrlor. Constructed 5571 ft additional power lin e , installed now circuit on present polo line from old existing reserrlor to Power House. Installed $ - 2400 ro lt transformers at Reserrlor at Lao Vegas, Sereda, lorn Commenced 2-7-46 m at Completed 4-50-47. 40 Bata fe ta l anount paid contractor MeBeil Sousing Company under the Contrast 9232823.00., divided between structures and pipe linos as shewn below. Pipe Lines. #88060 Pump louse 8640 Keulraent 1450 lir e Pfcwp muse 2016 Reserrlor 96286 Poms 1225 Bottling Basin 8924 transformer Bat 200 Operating Shpenea 26814 total #232828 the fallowing is a brief euamary of the dirision of expense for the Brians units of work performed under this work order as between Genpsny forest and Contractor* forces.